
The implementation of the underpass system at the intersection of Calle 72 and Avenida Caracas has significantly improved urban mobility in Bogotá by eliminating the existing traffic light crossing. This solution helped decongest one of the city’s most critical traffic points through a three-level infrastructure that optimizes traffic flow.
In addition to mobility benefits, the project recovered approximately 7,000 m² of public space, enhancing the pedestrian experience and urban connectivity.
Services provided: BIM coordination on site, weekly BIM progress tracking, control and reporting, implementation of a Common Data Environment (CDE) during construction, and development of as-built drawings.